Opening support, from 90 days out to week four.
Opening a first location, a second one, a catering kitchen or a unit inside a host retailer? I've led 12+ openings from one repeatable readiness playbook. I help owners sequence hiring, training, systems, inspections and the soft open so the store performs from week one.
Who it helps
- Owners opening a first restaurant with a date on the calendar.
- Operators adding a second or third location.
- Food businesses opening a unit inside a host retailer.
- Groups opening a catering or banquet channel next to an existing restaurant.
Problems I can address
- The opening date is set, but the plan lives in your head or in a group text.
- Hiring and training are scheduled after the equipment arrives.
- Permit and inspection dates keep moving, and nobody owns the calendar.
- You're not sure whether you need a soft open, a grand opening or both.
- The first location worked because you were there every shift. The next one won't have you.
What I take responsibility for
- The opening calendarEvery milestone dated from T-90, each with one owner, reviewed weekly until doors open.
- Hiring and pre-opening trainingWho to hire first, when training starts, and the mock services that test it before guests do.
- Systems and vendorsPOS, scheduling, inventory counts and vendor accounts set up and tested before the soft opens.
- Inspection readinessHealth and fire walk-throughs rehearsed against the checklist, with time left to fix what fails.
- Soft open and the first four weeksInvite-only services, the grand opening window and a weekly review of labor, food cost and guest issues.
Potential deliverables
- A dated opening calendar from T-90 to week four, with one owner per milestone.
- A hiring plan and order of hire, with the first roles to fill.
- A pre-opening training schedule, including mock services.
- A systems and vendor setup checklist (POS, scheduling, inventory counts, vendor accounts).
- An inspection-readiness walk-through checklist.
- A soft-open schedule and a weekly review sheet for weeks one to four.
An engagement uses the ones your situation needs. We agree the list in writing before work starts.
Evidence
| Figure | Result | Where, and my part |
|---|---|---|
| 12+ | New store openings led from a repeatable readiness playbook for staffing, systems setup and vendor contracts | Hana Group, Regional Director of Operations. I built the playbook; each opening was run with the unit general manager and the regional team. |
| 3 → 5 | Locations as the group grew, including a catering and banquet operation I built | Zareen's, Operations General Manager, 2019 to 2025. Growth was the group's; the operating standards for it were part of my role. |
How these figures are counted: each one is a result of a team I led, at the employer named, with my part described beside it. None are results for consulting clients. Employer names show where the work was done; they are not endorsements. Past results are not a forecast for your business.
In the Bay Area
Permits and plan review are local. In San Mateo County, new food facilities go through Environmental Health's food facility plan check. San Francisco publishes its own guide to opening a restaurant. Other Bay Area counties run their own reviews. I put those reviews on the opening calendar from the start instead of treating them as a last-week item. Your permit, lease and inspector dates come first; the plan bends around them.
Free planner
Put your opening date into the restaurant opening countdown and get the last 90 days as dated milestones, with a printable page and a calendar file. No sign-up, and nothing you enter leaves your browser.
Onsite and remote
Onsite, Bay Area
Walk-throughs, hiring days, pre-opening training, mock services, inspection rehearsals and soft-open week.
Remote, anywhere
The dated opening calendar, hiring plan, training schedule, systems checklist and the weekly review call.
How I think about it
- The 90 Days Before Opening Day
- The Twelve-Opening Playbook
- Soft Opening vs Grand Opening: Which a Restaurant Needs and When
- The Soft Open Week Schedule Hour by Hour
- Pre-Opening Training That Holds Past Week Six
- Licensing, Permits, and Inspection Timelines Nobody Plans For
- Week 1 Through Week 4 Post-Opening Cadence
How an engagement starts
- Step 1Send the opening date, the format and the location.
- Step 2We talk through where the plan stands today.
- Step 3I propose a written scope: which of the deliverables above, onsite days, and when I hand it back.
Have an opening date?
Send the date, the format and what worries you most. I'll reply by email to set up a first conversation.
Prefer email? eric@seod.com · Hiring for a full-time role instead? Recruiter brief
Other services
Multi-location
Several locations that report, cost and serve differently, and every manager still calls you.
See how I help →Cost and margin
Labor that doesn't follow sales, food cost nobody can explain, a location that lost money last quarter.
See how I help →Training and SOPs
New hires slow to get up to speed, every shift run differently, standards that depend on who is on.
See how I help →